PROJECT
BNSF Mud Bay Trestle Replacement
BNSF Railway
Pile Driving, Bridge Building, Marine Construction
OVERVIEW
Project Features
Replacement of 670m of existing timber trestle structure over water with new steel and concrete structure featuring 110’ long 36” dia steel pipe piles and precast caps and box girders. A full timber access trestle was constructed adjacent to the existing structure to allow work while the rail remained operational.
STARTING A PROJECT?
GET IN TOUCH WITH US TODAY
Whether for a future project, as a potential employee, or to obtain more information about our company, feel free to contact our office and we will connect you with person who can assist you.
+Contact Us