Iona Waste Water Treatment Plant
Kenaidan Contracting
Pile Driving, Ground Improvement
OVERVIEW
Project Features
We provided large scale ground densification for the new waste water treatment plant located on Iona Island.
Construction Included
• Supply and installation of approximately 5000 timber densification piles.
• Compressed schedule required the use of three cranes on a very small site.
• At peak production the rigs drove over 90 piles per day.
LOCATION
Richmond, BC
COMPLETED
2016