Neptune Terminals Coal Dumper Pit

CLIENT
Neptune Terminals

SECTOR(S)

Pile Driving

+BACK TO PROJECTS
Scroll to explore

OVERVIEW
Project Features

We were brought in to design and install a series of interlocked combi wall cofferdam cells to allow for construction of this new multiple train car dumper pit.

Construction included:
• Up to 120’ long piles, multiple layers of lateral bracing
• Up to 80’ of underwater excavation
• Tremie concrete bottom slabs with tie-down anchors.

LOCATION
North Vancouver, BC

COMPLETED
2020